BBCRA/CITY JOINT PROJECTS

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
Master ILA

BBCRA/City Joint Projects

PROJECT DESCRIPTION:

Following the FY23-24 Budget approval in September 2023, the BBCRA and City entered into an Interlocal Agreement (ILA) to provide BBCRA funding for design activities, materials and equipment, and installation costs associated with the physical improvements for specific projects as outlined in the BBCRA's Project Fund. The ILA which was approved by the City and BBCRA at their respective meetings on November 7, 2023 and November 13, 2023  details the responsibilities of the City and BBCRA, the procedures for reimbursement funding to the City, and the reporting requirements by the City to ensure compliance with the BBCRA Plan and Florida Statutes.

As an overview, the City will be responsible for overseeing the projects, coordinating with the contractor(s) and other entities as necessary for the completion of the projects. Additionally, the City will also be responsible for the maintenance of the improvements as a result of the project, along with contracting with other entities as necessary to comply with applicable codes. 

During the FY24-25 budget planning process, the BBCRA and City updated the project list which was reviewed and approved by both the City Commission and BBCRA Board. The table below provides an overview of the approved items:

CRA District

Project Item

BBCRA Funding

Description

Heart of Boynton

MLK Jr. Boulevard Streetscape Improvements

$800,000

Project Survey & Design & Construction: Punch through on NE 2nd to 9th, drainage.

Federal Highway

US 1 Beautification Project Design

$100,000

Landscaped median design

Downtown

Pence Park Reconstruction

$400,000

Conceptual Drawings/Design and Permitting

Federal Highway

Harvey Oyer Park Pier Survey & Design

$100,000

Survey, Conceptual Drawings, and Master Plan

Downtown

Senior Center Reconstruction

$100,000

Survey, Conceptual Drawings and Master Plan

Federal Highway

Jaycee Park Improvements

$100,000

Survey, Design and Permitting for Playground relocation, added green space and parking lot expansion

Cultural

Centennial Park Improvement Designs

$500,000

Design, Permitting and Construction

Heart of Boynton

Cottage District Road Improvements

$200,000

Paving for NE 4th Avenue widening

Federal Highway

Ocean Avenue Bridge

$150,000

For painting light poles over the bridge and revamping lighting under the bridge.